clifton-forge-tube-settlers

Clifton Forge WTP–Tube Settler Retrofit Increases Settling Capacity

Tube Settler Installations

Clifton Forge Water Treatment Plant

Tube Settler Retrofit Increased Settling Surface.

Two existing basins at the Clifton Forge, Virginia, Water Treatment Plant were retrofitted with MRI Tube Settler Systems. Each basin contains two effluent troughs. The area covered by the tube settlers is 27’-0” (W) x 18’- 2 ½” (L).

Due to the vertically compact structure of MRI Tube Settlers, the Clifton Forge retrofit added significantly more settling surface. Plant operators increased solids removal and design flow without requiring a larger footprint.

Visit an MRI Tube Settler Installation in Your Area.

Please call 303.279.8373, or email us to visit an installation in your area or discover more advantages of MRI Tube Settlers.

Find out more:

Download a tube settler brochure or request a printed brochure.

Get an overview of MRI’s water and wastewater treatment solutions.

to top